Projects

Frank Keane Motors

Harold Engineering Ltd was entrusted with the task of upgrading Frank Keane BMW’s workshop to enhance efficiency, safety, and workflow. The project involved the installation of high-quality equipment tailored to meet the needs of a modern automotive service centre.

APS Waterford

APS replaced its legacy 45 kW fixed-speed unit with an oil-free, variable-speed screw compressor (IRN45OF). Given the site’s variable load profile and historic pressure drops across downstream oil-removal filters, VSD control and the removal of oil-related ancillary stages offered a clear path to lower energy use and cleaner air.

Jamestown Bus Depot

Delivered a full turnkey installation at Jamestown Bus Depot to enhance operational efficiency, safety, and environmental performance. Scope covered design, supply, installation, and commissioning of a high-capacity drive-through bus wash, a water reclaim system, a fully integrated compressed air network, and an advanced vehicle fume extraction solution, including controls integration, training, and documentation.

Get Expert, Reliable Service, Fast

Have a project in mind? Contact us